IEC classification
The main phases of intervention are:
- Inspection on the area of interest
- Evaluation of the anemometric stations and their positioning
- Selection and validation of acquired wind data
- Correlations with long-term wind data
- Definition of the expected wind field on the site
- Estimated net expected production
- Estimation of the reference wind speed
- Estimation of the class of wind turbines in accordance with the CEI EN or IEC 61400-1 standard
- Evaluation of the compatibility of wind turbines with the site – CEI EN or IEC 61400-1 standard
The study is conducted by means of the most innovative analysis and calculation techniques currently on the market in the wind energy sector.
Other links: |
Other links: |
Other links: |